PAVING & DRAINAGE

Northaven Trail (2A,2B & 2C), Dallas, TX
 

Project included full PS&E for connection of Northaven trail Phase 2 from Preston Road to walnut hill station, approximately 6.5 miles long trail, utilizing primarily the existing ONCOR utility corridor. Due to narrow right-of-way in certain segments of the proposed trail alignment, several commercial private properties were impacted and therefore stakeholder input was vital to gain public support.  Public involvement meetings were held to coordinate the trail improvements and mitigate the effects on the private properties. 

Traffic Engineering Services

 

• Developed traffic control plans to minimize potential disruption to numerous commercial businesses located within the project limits during construction. Scope also included designing signalized intersection with aid of pedestrian hybrid beacons (HAWK) signals at major roadway crossings. 

Paving Design Services

 

• Prepared design plans for approximately 6.5 miles long trail concrete pavement,. Scope also included several roadway intersection improvements and upgrading commercial parking facilities along the trail. 

Drainage Design Services

 

• Scope also included improving existing drainage system along the trail and upgrade where necessary. Creek crossings located along trail were analyzed hydraulically to identify 100-year water surface elevation.

nhtrail.JPG
Need more details? Contact us