PAVING & DRAINAGE

Greenville Ave, Dallas, TX
 

Project included paving, street-scape, drainage and utility improvements along Greenville Avenue from Alta Street to Bell Avenue. The Greenville Avenue project included the challenge of minimizing impact to both pedestrian and vehicular access throughout construction to alleviate disruptions throughout construction to commercial businesses located within the project limits.

Traffic Engineering Services

 

• Developed traffic control plans to minimize potential disruption to numerous commercial businesses located within the project limits during construction.

Paving Design Services

 

• Prepared design plans for reconstruction of approximately 800 LF of 26-foot wide, concrete pavement, driveways, sidewalks and barrier free ramps.

Utility Design Services

 

• Designed approximately 800 LF of 12-inch water main. Required utility coordination efforts to identify location and elevation of franchise utilities.